Mostrando entradas con la etiqueta OLIVAREROS. Mostrar todas las entradas
Mostrando entradas con la etiqueta OLIVAREROS. Mostrar todas las entradas

9 mar 2012

PORTFOLIO OLIVAREROS

Utrera, 2009-2010

Os presentamos el portfolio de la obra Espacio Socio-educativo "Olivareros" en Utrera (Sevilla, España).
We present the portfolio for the project "Olivareros" Social and Educational Center in Utrera (Sevilla, Spain).

Pincha aquí / Click here

Español
12 páginas/pages
29,7x42 cms (alto x ancho / height by weight)
On-line: Publicado con Issuu / Powered by Issuu

Fotos/Photos: Pepe Florido

21 dic 2011

ARQUIA/PRÓXIMA 2011

Hemos actualizado el perfil de kauh en arquia/próxima / We have updated kauh's profile on the arquia/próxima website

Hemos incluido las siguientes novedades:
Nueva realización: Soil Cutaway Garden  (Mostraremos este proyecto en un post posterior)
Olivareros actualizado: Fotografías de Pepe Florido
Caravaca actualizado: Fotografías de David Frutos

This is what is new:
New project: 
Soil Cutaway Garden  (We will show this project in an upcoming post)
Olivareros Updated: Photographs by Pepe Florido 
Caravaca Updated: Photographs by David Frutos

+info: pincha aquí/click here (only in Spanish)
Arquia/próxima es el programa cultural de la Fundación Caja de Arquitectos, concebido para ofrecer apoyo a los arquitectos españoles en los diez primeros años de ejercicio profesional y basado en la difusión, promoción y puesta en valor de sus realizaciones y principios como profesionales. 
Arquia/próxima is a cultural program lead by Fundación Caja de Arquitectos. It was created to support the practice of the young Spanish architects with less than 10 years of experience. It is based on the diffusion, promotion and to make the most of their work and principles as an architects.

9 dic 2011

FOTOS/PICTURES "LOS OLIVAREROS" 16/16



Exterior, jardín (nivel 0) y terrazas (nivel 1-2): más espacio, sociablidad
Exterior, garden (level 0) and terraces (levels 1-2): more space, sociability

Fotografías/ Photographs: Pepe Florido

8 dic 2011

FOTOS/PICTURES "LOS OLIVAREROS" 13-14-15/16



Exteriores e interior, alzado frontal, vestíbulo vertical y perspectiva lateral: volúmenes y desplazamientos
Exteriors and interior, front view, vertical lobby and side view:  volumes and displacements

Fotografías/ Photographs: Pepe Florido

5 dic 2011

FOTOS/PICTURES "LOS OLIVAREROS" 6-7/16



Alzado lateral, general y detalle: presencia y materialidad
Side elevation, general and detail:  presence and materiality

Fotografías/ Photographs: Pepe Florido

2 dic 2011

FOTOS/PICTURES "LOS OLIVAREROS" 3-4-5/16


Vestíbulo vertical, niveles 0-1-2: interacción e identidad
Vertical lobby, levels 0-1-2: interaction and identity 

Fotografías/ Photographs: Pepe Florido

1 dic 2011

FOTOS/PICTURES "LOS OLIVAREROS" 2/16

Vestíbulo de entrada, nivel 0: reunión, fluidez y transversales
Entrance hall, level 0: reunion, fluidity and transversals

Fotografía/ Photograph: Pepe Florido

30 nov 2011

FOTOS/PICTURES "LOS OLIVAREROS" 1/16

Hemos recibido el reportaje de “Los Olivareros” realizado por el fotógrafo utrerano Pepe Florido / We have received the pictures of “Los Olivareros” taken by Pepe Florido, a photographer native of Utrera. (English text continues after Spanish text)

Tiempos: Concurso ganado en enero de 2009. Obra parte del Plan E. Redacción de proyecto básico y  ejecución en un mes. Entregado el 31 de marzo de 2009. Licitación resuelta 3 meses después. El verano andaluz no perdona y la obra comienza en septiembre 2009. Año apasionante de obras. Finaliza en septiembre 2010. “Los Olivareros” se inaugura y abre al público el 23 de marzo de 2011.

En ese periodo de impasse entre la finalización oficial de la obra y su definitiva puesta en uso, tuvimos la suerte de que Pepe Florido se acercara al edificio y volcara sobre él su particular mirada. Cuando contamos esta intervención, casi siempre mencionamos su contexto urbano en transición. El entorno se mueve entre la desolación del peor planeamiento urbanístico contemporáneo, el aburrimiento de unas construcciones residenciales banales y la sinceridad de unas decrépitas arquitecturas industriales. Este confuso medio urbano, y en particular su versión utrerana y andaluza, lleva siendo objeto de la obra fotográfica de Pepe Florido desde hace ya algún tiempo. Así pues, sonreímos al ver cómo reacciona su objetivo de manera tan natural al enfocar sobre una intervención que, siempre entendimos, debía tener sus resonancias e incluso subrayar la necesidad urbana y espacial que nuestras ciudades tienen para que exista este paisaje de tensiones y confluencias.

Os dejamos aquí la colección de fotos. En los próximos días iremos mostrándolas, foto a foto, en sucesivos posts.

English text:

Time line: A competition won in January 2009; the project becomes part of the central government’s economic stimulus plan. A full project drawn up in one month; handed in on March 31 2009. Call for tender solved in three months time. The Andalusian summer prevails and breaking ground takes place in September 2009. A thrilling year of building. Construction ends in September 2010. “Los Olivareros” is inaugurated and opens to the public on March 23 2011.

In the interim period between the end of construction work and its definite put to use, we were lucky enough to have Pepe Florido visit “Los Olivareros” and capture it through his own perspective. Whenever we explain this intervention, we almost always mention the transient nature of its urban context. Its surroundings waver between the desolation produced by the worst kind of contemporary urban planning, the boredom of trivial housing units and the sincerity of decrepit industrial architectures. This confusing urban milieu, and specifically Utrera’s and southern Spain’s version of it, has been an ongoing theme in Pepe Florido’s photographic work. That is why we smile when we see how his lens reacts naturally when it focuses upon a building that, as we always understood it, had to echo and even underline the urban and spatial need our cities have for the existence of this landscape of tensions and convergences.

Here is the collection of pictures. In the following days we will be showing them in a series of posts.


+ info web Pepe Florido: http://www.pepeflorido.com/

Las entradas etiquetadas como CERCA-DE-KAUH muestran el trabajo de amigos, compañeros y otros profesionales / Posts tagged CLOSE-TO-KAUH show work by friends, colleagues and other professionals.

30 mar 2011

OLIVAREROS INAUGURADO / OLIVAREROS INAUGURATED

El pasado míércoles 23 de marzo de 2011, quedó abierto al público el espacio socio-educativo Los Olivareros. Last Wednesday March 23, 2011 Los Olivareros educational and social center was opened to the public.

Despúes de haber ganado el concurso para llevarlo a cabo en enero de 2009, haber redactado el proyecto completo correspondiente en los meses de febrero y marzo de ese mismo año, haberse iniciado la obra en septiembre de 2009 y finalizado en septiembre de 2010, fue un placer para nosotros estar presentes en la inauguración y entrega del edificio para el uso proyectado. Incluso durante el acto y la posterior fiesta que hubo, empezamos a ver cómo los espacios y elementos que pensamos y materializamos empezaban a ser usados, algunos tal y como se preveía, otros de manera inesperada.
Para nosotros la experiencia de llevar a cabo este proyecto significa no sólo materializar las reflexiones de partida sobre su ubicación y emplazamiento, o lo que siginifica un uso intergeneracionalmente compartido, o la comunicación al exterior de la conjunción de programas por el apilamiento de volúmenes o el uso de un rótulo luminoso (reflexiones ya hechas en anteriores posts y que podéis leer en su conjunto en nuestra web en la sección "Trabajos-proyectos y obras", o en la etiqueta olivareros), sino también atender a la lógica impuesta por la premura del proceso, con la incorporación y coordinación de otros equipos de trabajo, con sus aciertos y dificultades. Seguiremos aprendiendo.

After winning the competition to design it in January 2009, writing up the full blown project design during the months of February and March of that year, having begun construction in September 2009 and finished in September 2010, it was our pleasure to be present at the opening and handing over of the building for the public use it was designed for. Even during the ceremony and the little celebration that took place afterwards we already began to see how the spaces and elements we laid out were beginning to be used, some as expected and others surprisingly so. For us, the experience of carrying out this project goes beyond materializing our first thoughts about its location and position, or what an intergenerational use entails, or how to externalize the grouping of programs by piling up volumes or using a luminous sign (thoughts we've talked about on previous posts and you can read about on our website under the section "Works-projects and built work", or under the label olivareros in this blog) but also to understand the rationality of its construction given the necessary speed with which it needed to be built as well as the incorporation and later coordination of other teams and agents, with its successes and difficulties. We shall continue learning.

Así lo han contado / Other coverage:
Ayuntamiento de Utrera / Utrera Municipality
Utrera on-line
InfoUtrera
UtreraDigital
Uvitel (con/with video)

10 feb 2011

Cuentra atrás para Olivareros / Olivareros countdown

Parece que la puesta en uso de "Los Olivareros" está muy cerca.
It looks like "Los Olivareros" will open very soon.

Así lo está contando en / This is what they are saying at Utrera Digital

29 dic 2010

Aceitunas / Olives

Lata de aceitunas (edición limitada) / Olive can (limited edition)
kauh te desea ¡feliz 2011!
kauh wishes you a happy 2011!

13 dic 2010

A bench story / Historia de un banco

 
It must have been 1990 or 1991 when one fine day a bunch of furniture appeared in the patio of my family house in Utrera. Apparently, my mother had gone to buy olive oil directly from the processing factory and had returned not only with the oil, but with this pile of stuff she’d noticed haphazardly strewn about the factory premises. Among it all there were three long wood benches, their length fitting perfectly with that of our long Edwardian dinning table (the table is a whole other story). To this day, two of those benches are still in use at that table. At the factory, the benches had been used by “fabricantas”—the name given in the town to the women who worked for the local olive industry—during their rest stops or even while actually selecting, rinsing, pitting or dressing table olives.

Kauh’s “Los Olivareros” project sits on the site where that factory used to stand, and it was just a matter of time before we ended up designing some benches for the building. And those benches names just had to be “Olivia G”, “Olivia M” and “Fabricanta”. “Fabricanta” is a take on my parents’ benches. It’s just about as long, but its seat is wider and made up of multiple boards instead of just one long plank; given its hidden steel structure, it doesn’t need the wood bracings the original benches had. “Olivia G” is even longer than “Fabricanta” and it curls up to embrace space and its users. “Olivia M” would fit into the space that “Olivia G” seems to want to hold tight, while “Olivia M” imagines its users sprawling all over the place. In a couple of month’s time we shall see how this new family of benches fares.

Debía rondar 1990 o 1991 cuando un buen día un montón de muebles apareció en el patio de la casa de mi familia en Utrera. Al parecer, mi madre había ido a comprar aceite de oliva directamente a la fábrica y había vuelto no sólo con el aceite, sino con ese conjunto de chismes que había visto desperdigados por el recinto fabril. Entre todos ellos se encontraban tres largos bancos de madera cuya longitud encajaba a la perfección con la de nuestra larga mesa de comedor de estilo eduardiano (pero la mesa es otra historia). A día de hoy, dos de aquellos bancos siguen en uso alrededor de esa mesa. En la fábrica los bancos habían sido usados por las “fabricantas” —el nombre que recibían las mujeres que trabajaban en la industria aceitunera local— durante los descansos e incluso durante la selección, lavado, deshuesado o aliñado de las aceitunas de mesa.

El proyecto “Los Olivareros” de kauh se encuentra en parte del solar sobre el cual se hallaba la fábrica, y era simplemente una cuestión de tiempo acabar diseñando unos bancos para el edificio. Y sus nombres tenían que ser “Olivia G”, “Olivia M” y “Fabricanta”. “Fabricanta” está inspirado en los bancos de mis padres, tiene casi la misma longitud, aunque su asiento es más ancho y está compuesto por múltiples tablillas en vez de un solo tablón largo. Dada su estructura de acero oculta, no son necesarios los arriostramientos en madera que tienen los originales. “Olivia G” tiene una longitud incluso mayor que “Fabricanta” para poder enroscarse y abrazar el espacio y a los usuarios. “Olivia M” podría caber en el espacio que al parecer “Olivia G” quiere sujetar con fuerza, solo que “Olivia M” imagina a sus usuarios desparramados por todas partes. En un par de meses veremos cómo le va a esta nueva familia de bancos.

 


10 jun 2010

El edificio tiene nombre y apellidos / The building has a full name

La semana pasada asistimos a la colocación del rótulo luminoso con el nombre del edificio: olivareros, espacio socio-educativo / Last week we attended the setting up of the luminous sign with the name of the building: olivareros, espacio socio-educativo

"Los Olivareros" era el nombre de la fábrica de aceitunas que existió en ese lugar. Hace aproximadamente una década se recalificaron estos terrenos, la fábrica se trasladó, el complejo fabril fue desmontado y se proyectó una barriada residencial. Una transformación urbana alentada por la cercanía al centro de la ciudad y los nuevos requisitos funcionales de este tipo de industrias. En este momento la situación transitoria es un paisaje suburbano fragmentado, en el que conviven viviendas adosadas, un espacio libre sin cualificar que no llega a ser público por su desuso y algunas arquitecturas industriales que aún perviven: los silos, una chimenea o unas naves municipales. Es en el margen donde el planeamiento prevé en hilera tres equipamientos; este edificio además de una guardería y una iglesia evangélica. El espacio socio-educativo es un apilamiento de tres grandes contenedores que en parte toman su materialidad y sistemas constructivos de las naves y almacenes actuales. Así decidimos rescatar la memoria industrial del lugar para aportar complejidad y, por qué no decirlo, confusión al entorno. Complejidad porque participa de la fragmentación urbana y confusión porque cuestiona la homogeneización que propone este planeamiento.

“Espacio socio-educativo” es el programa del edificio. Aglutina usos muy populares entre los ciudadanos de la localidad: salas de estudios y aulas con sus correspondientes espacios de sociabilidad, y provocará la afluencia de usuarios "no residenciales" de la barriada. Así, esperamos que el edificio colabore en aportar intensidad urbana a este entorno hasta ahora poco potenciado: que al menos aparezca algún quiosco o café, que se reúna algún grupo de estudiantes en los bancos del parque, que el autobús urbano pare en la puerta, etc.

Los Olivareros was the name of the olive processing factory that once existed in this place. Around a decade ago a change in land-use occurred, the industry moved, the factory complex was dismantled and a residential neighbourhood was planned. This transformation was pushed by its proximity to the center of town and the changing needs of this type of industry. The current situation is that of a fragmented suburban landscape in which terraced houses, an open space (which is not quite public because it is underused) and some industrial architectures that still persist (the silos, a smokestack and municipal storage facilities) all coexist. It is on the edges of this area where a row of three public facilities has been planned; this building, along with a day care center and an evangelical church. This social and educational space is the result of piling up three container-like volumes that, in part, take up their materiality and construction technique from current storage and industrial warehouses. We decided to rescue the industrial trait of the place to add complexity and, why not say it, confusion to the setting. Complexity because the building takes part in the urban fragmentation, and confusion because it puts into question the homogenization that urban planning strives for.

“Social-educational space” is the building’s program. It agglutinates uses that are very popular among the town’s residents: study halls and classrooms with their corresponding sociable spaces, inciting the influx of “non residential” users to the neighbourhood. We hope the building will help introduce a certain urban vibrancy to a setting which clearly lacks of it; that at least a small coffee shop or kiosk will spring up, that a group of students will get together on one of the park’s benches, or that the bus will stop at the facility’s door.

25 feb 2010

Espacio Socio-educativo Los Olivareros / “Los Olivareros” Social and educational Center

Tiempos: la obra avanza / Timings: the building is under construction

Por nuestra corta experiencia y los comentarios de compañeros, el tiempo que suele transcurrir entre un concurso ganado, el encargo del proyecto, su redacción y revisiones, el proceso de licitación y el desarrollo de la obra en sí, se dilata y pasan bastantes años. En este caso, enmarcado en el Plan E, hace apenas un año ganábamos el concurso, en el mes posterior se entregó el proyecto y ahora las obras avanzan a buen ritmo. Sin embargo en otro proyecto para este mismo proceso pasaron seis años. La gestión del tiempo y cómo influye en el proyecto, para nosotros, forma parte del reto creativo.

Our short experience and the comments of our colleagues, tell us that the time that goes by between the moment a competition is won, the project is commissioned, it is written up, it is revised, the bidding process takes place and it is built, often stretches and several years go by. In this case, within the context of the Plan E, it was barely a year ago when we won the competition, within a month we had drawn up the project and now construction is well under way. However for another project this same process lasted six years. For us, time management and how it influences the project is part of the creative challenge.

Breve descripción del proyecto/ short brief of the project:

El programa propuesto se apila (sala de estudio municipal y aulas, usos que conllevan altos grados de sociabilidad). Un vestíbulo vertical producto de la “destrucción Matta-Clarkiana” de forjados y huecos interconecta las plantas, a la vez que éstas se desplazan entre sí generando espacios exteriores en todos los niveles… / We pile up the uses given in the project brief (a large study hall for students of all ages and a series of classrooms, uses accompanied by high levels of sociability). A vertical lobby, the product of the “destruction” of the floor slabs and openings in a Gordon Matta-Clark manner, interconnects the different levels, while these slip against each other generating outdoor spaces at different elevations…

Data:
Concurso. Primer Premio / Competition. First Prize. 2009
Fecha proyecto / Project date: 2009
Fecha obra / Construction date: 2009-2010
Promotor / Organizer: Ayuntamiento de Utrera. Plan E.
Colaboradores Proyecto/ Collaborators: IS Ingenieros (Instalaciones/ installations), Mª José García García (Estructura/ structure)
Arquitecto técnico / Construction engineer: Fernando Ruíz
Constructora / Contractor: PROHERNA
Superficie / Area: 1.500,00 m² construida / built
Presupuesto / Budget: 1.495.570 €